Website profile

@Rivieramaritime

Providing operational and technical shipping news and in-depth analysis on ship design, build, operation, repair, recycling, regulation and technology from around the world.

  • 104articles · 30d
  • 4+ day agolatest article
  • Aug 16, 2026earliest in window
  • 86%with images
  • 305avg words
articles per day
Categories
  • Economy, Business & Finance 79
  • Transportation 70
  • Business & Industrial 57
  • News 17
  • Industrial 16
  • Autos & Vehicles 16
  • Environment 10
  • Finance & Business 9

Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

Riviera
rivieramm.com > news-content-hub > cm-energy-targets-european-main-component-exchange-market-89901

China’s CM Energy targets European main component exchange market

6+ day, 21+ hour ago   (335+ words) Hong Kong-based CM Energy has announced plans to introduce the jack-up vessel CM Zenith into the European offshore wind market from Q1 2028 The company, which is part of the China Merchant group, will introduce the jack-up to the European market after…...

Google News
rivieramm.com > news-content-hub > news-content-hub > borkum-riffgrund-3-offshore-windfarm-enters-commercial-operation-89842

Riviera - News Content Hub - Borkum Riffgrund 3 offshore windfarm enters commercial operation

1+ week, 5+ day ago   (221+ words) Ørsted and Nuveen Infrastructure’s Borkum Riffgrund 3 offshore windfarm is now fully commissioned and in commercial operation With an installed capacity of 913 MW, the project is one of Germany’s largest operational offshore windfarms. Borkum Riffgrund 3 is supported by several long-term corporate…...

Riviera
rivieramm.com > news-content-hub > borkum-riffgrund-3-offshore-windfarm-enters-commercial-operation-89842

Borkum Riffgrund 3 offshore windfarm enters commercial operation

1+ week, 5+ day ago   (221+ words) Ørsted and Nuveen Infrastructure’s Borkum Riffgrund 3 offshore windfarm is now fully commissioned and in commercial operation With an installed capacity of 913 MW, the project is one of Germany’s largest operational offshore windfarms. Borkum Riffgrund 3 is supported by several long-term corporate…...

Riviera
rivieramm.com > opinion > from-compliance-to-contribution-how-nature-inclusive-design-is-reshaping-offshore-wind-89784

From compliance to contribution: how nature-inclusive design is reshaping offshore wind

2+ week, 4+ day ago   (655+ words) For many years, environmental work in offshore wind was largely viewed through the lens of compliance. Developers focused on securing consent, satisfying licence conditions and meeting monitoring requirements — all essential parts of responsible project delivery. But the industry is changing,…...

Riviera
rivieramm.com > news-content-hub > cadeler-delivering-on-its-strategy-posts-strong-financial-results-89776

Cadeler ‘delivering on its strategy,’ posts strong financial results

2+ week, 5+ day ago   (260+ words) Offshore wind installation company Cadeler says revenue and EBITDA more than doubled in H1 2026 compared with the same period in 2025 Publishing interim financial results for the first half of 2026, the company said they demonstrate that its fleet strategy “is delivering as…...

Riviera
rivieramm.com > news-content-hub > focus-on-15-mw-wind-turbines-could-challenge-less-capable-vessels-89770

Focus on 15-MW wind turbines could challenge less capable vessels

2+ week, 5+ day ago   (353+ words) The rate at which the size of offshore wind turbines has grown has challenged installation-vessel owners to keep up. It is argued that eventually, smaller, less capable vessels will be forced out, into the operation and maintenance market, but opinions…...

Riviera
rivieramm.com > news-content-hub > how-2027-emissions-trading-changes-the-economics-of-offshore-electrification-89769

How 2027 emissions trading changes the economics of offshore electrification

2+ week, 6+ day ago   (653+ words) Paul Cairns, chief executive of Charge Offshore, explains why the expansion of UK and EU emissions trading to large offshore vessels changes both the operational and capital investment case for fleet electrification and charging infrastructure Offshore wind is designed to…...

Riviera
rivieramm.com > news-content-hub > chinas-dajin-heavy-ardersier-port-plan-offshore-wind-hub-in-scotland-89751

China’s Dajin Heavy, Ardersier Port plan offshore wind hub in Scotland

3+ week, 2+ day ago   (271+ words) Dajin Heavy Industry in China has agreed a memorandum of understanding with the owner and developer of the Ardersier Port in Scotland that could see them jointly develop an offshore wind hub The agreement brings together Dajin’s integrated offshore wind…...

Riviera
rivieramm.com > news-content-hub > pacifico-energy-secures-deal-to-develop-koreas-jindo-offshore-wind-cluster-89747

Pacifico Energy to develop Phase 2 of Korea’s Jindo offshore wind cluster

3+ week, 2+ day ago   (215+ words) US-based Pacifico Energy Korea has been selected as the sole developer of Phase 2 of the 2.13-GW Jindo offshore wind integrated cluster offshore South Korea The cluster is a government-designated offshore wind development area comprising the Manho and Jindo Baram projects,…...

Riviera
rivieramm.com > news-content-hub > offshore-wind-transmission-systems-driving-demand-for-cable-lay-vessels-89732

Offshore wind, transmission systems, driving demand for cable-lay vessels

3+ week, 3+ day ago   (305+ words) In August 2026, submarine cable manufacturer NKT confirmed that its new cable-lay vessel, NKT Eleonora, had reached Norway, arriving at Vard shipyard, Brattvaag, where the final phase of construction and outfitting of the vessel will take place Compared with NKT Victoria,…...